Construction of a 4 star hotel with a capacity of 116 rooms.

The first 2 levels of the hotel (ground floor and level +1) are dedicated to reception rooms, a restaurant, kitchen, etc., configured around the main entrance hall. The +2 level has a presidential suite and a wellness suite. The upper floors (from level +3 to level +11) are dedicated to hotel rooms of different grades. The top level (+12) consists mainly of a technical area and bedrooms. Finally, the basement consists of the indoor swimming pool, the fitness zone, service areas, and technical areas.

 Design office missions:

 

Owner

Van der Valk Hotel

Architect

Bureau SL+

Contractor

CIT Blaton

Cost

14,000,000 €

End of works: 2017

Surface

9,700 m²

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *